合作单位:中国城市科学研究会 建设部科技发展促进中心 中国城镇供水排水协会
 
设为首页
加入收藏
订阅《能源视点》:

 您的位置:首页 > 工程案例 > 公共建筑 > 科教 > 
Dlo'ay azhi school

时间:2007-04-24 16:49:57 作者:佚名 来源:筑能网

 

地址: Prewitt, NM 

建筑面积: 7,330 sq. meters

竣工日期: August 2003

能源利用: Green Strategies

Solar Cooling Loads

Minimize number of skylights

Use east and west windows with a low SHGC

Shade south windows with overhangs

Use south windows with a low SHGC

Daylighting for Energy Efficiency

Use building elements to redirect daylight and control glare

Use skylights for daylighting

Use north/south roof monitors and/or clerestories for daylighting

Locate floor openings under top-lighting to increase daylighting penetration

Cooling Systems

Use air-cooled mechanical cooling equipment

Light Sources

Use high-efficacy T8 fluorescent lamps

Lighting Controls

Use occupancy sensors

HVAC Controls and Zoning

Use variable-volume air distribution systems

Roof Insulation

Achieve a whole-roof R-value of 25 or greater  节水方案: Water Conservation and Use

The site is located in an arid region in the midst of a long-term drought. Water in this area is obtained from deep, low-producing wells. Due to the its remote location, the school needed its own water supply, and a water tower was included in the project.

Low-flow fixtures (using 0.5 gallons of water per minute) with motion sensors save a significant amount of water. The building is expected to use at least 30% less water than a comparable, conventionally designed building.

Since water use for any purpose is expensive, exterior use can be justified only for the establishment of drought-tolerant plants that require little water. The design team selected netleaf hackberry, rocky mountain juniper, valley cottonwood, and purple robe locust trees; fourwing saltbush and chamisa shrubs; beargrass and banana yucca succulents; and winecups groundcover. It is hoped that the natural landscaping will form a part of the educational curriculum and teach children about the ecology of the area.

After a period of temporary drip irrigation (a maximum of two years) all of these plants will be forced to depend on rainfall to survive. At that point, all visible emitters from the drip irrigation system and all control valves and controllers will be removed. The underground plastic piping will be abandoned.

Runoff from the building is channeled through carefully sculpted rock arroyos to maximize onsite infiltration. Native plants will be allowed to grow along these areas. As much site runoff as possible is channeled to low-lying areas to maximize onsite infiltration.

材料选择: Recycled materials were used wherever possible in the building construction. The concrete masonry units were manufactured with flyash replacing about 18% of the portland cement; recycled steel scrap provided more than 90% of building's structural steel; and the gypsum core of the wallboard products was comprised of about 8% recycled materials. In total, 6.9% of the building materials, by cost, were recycled, as per the LEED v2 calculations.

Materials manufactured regionally were also preferred, in order to minimize the transportation costs associated with the building. Just over 47% of the total value of the materials and products used were manufactured within a 500-mile radius of the building site, a region that includes Albuquerque, New Mexico; Phoenix and Tucson, Arizona; Salt Lake City, Utah; Colorado Springs, Colorado; and Lubbock and El Paso, Texas. Of those materials, at least 50% of the content was extracted within 500 miles of the site.

Designated recycling bins are located in key areas of the school, including the cafeteria, classrooms, copy areas, and workrooms. Products to be recycled include paper, glass, aluminum, and plastic. All recyclable materials are then placed in appropriate canisters in the recycling room or taken directly to larger receptacles adjacent to the loading dock at the service entry. All children are expected to participate in this program.

Green Products Used

Air Filters

Green Strategies

Protection of Global Ecosystem

Minimize ozone-depletion potential of refrigerants in cooling systems

Recycling by Occupants

Specify recycling receptacles that are accessible to the occupants

Transportation of Materials

Prefer materials that are sourced and manufactured within the local area 

室内环境品质: Green Strategies

Outdoor Pollution Sources

Locate building away from sources of pollution

Entry of Pollutants

Design entry to facilitate removal of dirt before entering building

Visual Comfort and The Building Envelope

Use skylights and/or clerestories for daylighting

Visual Comfort and Interior Design

Locate floor openings under skylights to increase daylight penetration

Ventilation and Filtration Systems

Specify ventilation rates that meet or exceed ASHRAE Standard 62-1999

Direct Exhaust from High-source Locations

Provide local exhaust ventilation for rooms with high-emitting sources

Ventilation During Construction

Provide temporary filters on any permanent air-handling devices used during construction

Building Commissioning for IEQ

Commission the mechanical and electrical systems prior to occupancy

Maintenance for IEQ

Specify use of only nontoxic cleaning products

Facility Policies for IEQ

Recommend a non-smoking policy for the building  

内容:

 

新闻订阅】 【打印】 【网站论坛】 【字体: 】 【发表评论】 【关闭
现有 人对本文发表评论 [查看所有评论]
昵称:  请输入验证码:   看不清图片,请点击图片!
申请加精
相关文章

最新资讯
·可再生能源:如何从花瓶能源到主导能源
·陕西:清洁能源发展潜力大
·国际节能减排面面观
·新颁布条例如何推进民用建筑节能的开展?
·既有民用建筑节能改造艰巨 居民恐负担部分费用
·别让伪劣材料毁了建筑节能大业
·国家利益与能源战略
·从奥运看绿色节能材料走进生活
·后能源时代已经悄然来临
·从化石能源向新能源过度 三大细分行业前景各异
 
下载排行
·《ANSYS工程结构实例分析》
·《工程勘察设计收费标准(2002年修订本)》
·《室内设计基础》
·《大学生建筑设计优秀作品集》
·《建筑设计作品博览 国外建筑竞赛优秀作品精粹
·《节能技术实用全书》(上卷)
·《光与建筑》
·《家居装修精选方案》
·《钢结构设计原理》
·《建筑力学与建筑结构》
 
行业新闻
热点专题

风能时代离我们还有多远

绿色建筑评价标识

太阳能光伏

奥运场馆践行绿色奥运
政策分析
行业人物
郑时龄
孟宪淦:破解太阳能与建筑两张皮
最新论文
最新书籍

活性炭生产工艺原理与设计

《流体力学》
最新图纸
最新资料
招标信息
论坛精华

住房和城乡建设部科技与发展促进中心(CSTCMOC) 中国绿色建筑委员会(CHINAGBC) 国际智能、绿色建筑与建筑节能大会(IGEBC) 指定合作网站
承办:沃德高科(北京)科技有限公司
Copyright ©2007-2008 CHINAGB.NET.All Rights Reserved.   京ICP备07024683号
通信地址:住房和城乡建设部北附楼312室(100835)
联系信箱:nengyuanshijie163.com  传真电话:010-88585380
合作热线:010-88585610/11/12转814/813/810/  合作部:QQ:122236888 编辑部:769172617 

关于我们 - 联系我们 - 广告服务 - 友情链接 - 网站导航