Georgia健康实验室

时间:2007-04-25 17:14:56 作者:未知 来源:筑能网

 

 

地址: Decatur, GA

建筑面积: 6,130 sq. meters

竣工日期: November 1997 

高度: 2-story building

能源利用: The building envelope is well-insulated with R-19 wall insulation and R-21 roof insulation. The roof, which is almost an acre in size, has a highly reflective surface to minimize heat gain, and low-e glazing optimizes the building's heating and cooling efficiency.

To supplement daylighting, labs and offices have direct/indirect lighting fixtures, which use T-8 lamps and electronic ballasts. Automatic dimming controls were not incorporated into this design, but they could provide a means to increase the energy savings resulting from the use of natural lighting.

The HVAC equipment is a constant-volume system that moves air at 70,000 cubic feet per minute (cfm). The 11 fume hoods in the building are connected to a manifold exhaust system. Six high-induction air exhaust fans are on the roof directly above the service corridor, and exhaust stacks are 12 feet high above the roof line.

Fans have variable-frequency drives and direct-drive motors to balance the air in the system. The motors are directly coupled to a fan and do not use belts. The air-handling unit is located on the second floor directly above the mechanical room, which contains the chillers and boilers. Inlet air is drawn from the north side of the building at ground level. A direct digital control system is used for equipment controls.

Each of the two 200-ton chillers can provide enough cooling for the entire building. Heating is provided by two 125-boiler horsepower (BHP) gas-fired steam boilers. There are three shell-and-tube heat exchangers—one for domestic hot water, one for humidification, and one for reheat coils. Steam is used for sterilizers and glassware washers. Emergency power is provided by a 400-kilowatt generator with a natural-gas engine. 节水方案: After several design iterations, the design team determined that it would be most sensitive to the site to locate the building on the north portion of the site and place parking areas on the southern portion. This allowed many trees to be retained and required only minimal grading.

Taking advantage of the naturally sloping site, the rectangular second floor of the laboratory is larger than the first floor, extending on-grade much farther north than the first floor. This allowed many laboratory areas to be built on-grade, reducing vibrations where sensitive equipment is used.

材料选择: Materials were chosen primarily for their durability, cost-effectiveness, and environmental qualities. Recycled materials were used extensively on the exterior facade. Durable granite, salvaged from the waste of local tombstone crafting operations, forms tapered vertical piers that act as sunshades for west-facing windows. Recycled copper was used over structural metal studs to cover the upper portion of exterior walls. These materials cost no more than a standard brick wall.

室内环境品质: To provide the laboratory staff with bright work areas and views to the outside from almost anywhere inside the building, recessed clerestory windows above the offices provide a direct line of sight to the outdoors from the labs and clerical spaces. Although these windows face west, glare from late-day sunlight is controlled by vertical granite piers on the facade and a 12-foot-deep roof overhang. The furniture in the clerical areas is designed to have low partition walls that do not block the view of the trees and sky. Interior windows between the labs, offices, and office support areas also allow light to permeate the building, and create an open, seamless feel.

The lab areas and support spaces take up approximately 34%, or 22,906 gross feet of the building and use 100% outside air. The remaining areas use 20% outside air with 80% recirculated air. In both the BL-2 and BL-3 labs, there are 10 air changes per hour (ACH); at night, setbacks drop this to 6 ACH.

新闻订阅】 【打印】 【网站论坛】 【字体: 】 【发表评论】 【关闭
共有 人对本文发表评论   [查看所有评论]
昵称:  验证码: 看不请,请单击图片!
申请加精
相关文章

最新资讯
·使用中央空调在线清洗装置年节电可超1亿度
·中惠电热膜供热系统:和居•暖居&#
·乌鲁木齐:操场巷节能改造项目10月份竣工
·上海闵行:节能建筑“穿戴”三件套
·奥运场馆建设催生科技创新
·众多奥运场馆成为节能降耗可持续发展道路的典范
·印尼:将起草“绿色法规” 强制推行“绿色设计”
·南京:强制执行建筑节能新规遭遇“打折扣”
·北京奥运旋风实践“绿色奥运、科技奥运、人文奥运
·奥运会空气质量:凸显“绿色奥运”理念
 
下载排行
·《ANSYS工程结构实例分析》
·《建筑设计作品博览 国外建筑竞赛优秀作品精粹
·《大学生建筑设计优秀作品集》
·《室内设计基础》
·《节能技术实用全书》(上卷)
·《光与建筑》
·《建筑力学与建筑结构》
·《家居装修精选方案》
·《钢结构设计原理》
·《百年建筑:天人合一 馆人合一》
 
行业新闻
热点专题

中国既有建筑节能改造之路

电器能效标识进行时

携手能源世界共助震区灾民

公共建筑节能降耗启示录
政策分析
行业人物
郑时龄
孟宪淦:破解太阳能与建筑两张皮
最新论文
最新书籍

《大气污染控制工程》

《大气环境模式计算方法》

《城市中小型污水处理厂的建设与管理》

《城市污水处理厂的建设与管理》
最新图纸
最新资料
招标信息
论坛精华


住房和城乡建设部科技与发展促进中心(CSTCMOC) 中国绿色建筑委员会(CHINAGBC) 国际智能、绿色建筑与建筑节能大会(IGEBC) 指定合作网站
承办:沃德高科(北京)科技有限公司
Copyright ©2007-2008 CHINAGB.NET.All Rights Reserved.   京ICP备07024683号
通信地址:住房和城乡建设部北附楼312室(100835)
联系信箱:nengyuanshijie163.com  传真电话:010-88585380
合作热线:010-88585610/11/12转810/809/808/  QQ:396630266 304586884  MSN:lian572hotmail.com  

关于我们 - 联系我们 - 广告服务 - 友情链接 - 网站导航