| 合作单位:中国城市科学研究会 建设部科技发展促进中心 中国城镇供水排水协会 |
| 您的位置:首页 > 工程案例 > 公共建筑 > 行政、办公 > |
|
C. K. Choi Building
时间:2007-04-27 15:57:23 作者:佚名 来源:筑能网
地址: 建筑面积: 3,200 sq. meters 竣工日期: April 1996 高度: 3-story building 能源利用: An energy meter enables the building owner and users to monitor actual energy use in the building and to make adjustments in operations as necessary. Due to the extent of natural daylighting, power consumption for lighting is less than half that required for typical office buildings. Offices do have manual light switches; control systems turn off lights if a room is vacant or dim lights if there is adequate daylighting. (Atria admit daylight into the second-floor work spaces while higher ceilings at the ground floor facilitate daylighting. Also, reflective surfaces throughout enhance daylighting.) Operating energy is reduced by the elimination of a traditional ducted air system; the building relies on natural ventilation (no air conditioning) and a few fans to assist when necessary. To reduce cooling loads, existing trees along the 300-foot ( The heavy concrete building mass also reduces the problem of diurnal temperature swings. This mass will cool down overnight to essentially store cooling energy. This storage effect is used during the day to provide "free cooling." Water heating is provided by the University steam system. Individual controls are used as opposed to the more costly DDC control systems. South-facing roofs optimize direct gain at photovoltaic panels; chimneys facilitate ground-floor stack effect. R-values suggested under ASHRAE 90.1 are exceeded for walls, ceiling, and glazing. High-efficiency luminaires are incorporated with lower ambient lighting levels and task lights where appropriate. (Ambient lighting levels have been reduced to 0.5 W/ft2, or 5.4 W/m2.) 节水方案: A water-efficient subsurface irrigation system based on the principle of "xeriscaping" was introduced. This method conserves water and protects the environment. Stormwater and water from the sinks is recycled in a subsurface graywater trench with marsh vegetation. Composting toilets function without water; they provide an effective and efficient means of disposing of solid waste with the aid of ventilation and organic matter such as wood chips. This waterless system allows the building to be disconnected from the sanitary system. The end product is a humus-like soil amendment that can enrich depleted soils. A water meter within the building monitors consumption of the combined water and fire protection service line that is required to service the building. City water is used for the low-flow lavatory faucets (spring-loaded to further reduce water waste) and kitchen sinks. Storm, sanitary, steam, condensate, and gas lines are not required. Stormwater is reused for irrigation on site instead of being discharged into storm drains. Overflow stormwater is discharged. Green Strategies Non-water-using Fixtures Use composting toilets Runoff Reduction Avoid contiguous impermeable surfaces Water Conservation Education Educate building management and employees about water conservation Rainwater Collection Collect and store rainwater for landscape irrigation Construction Impacts Designate appropriate staging areas for construction-related activities Integration with Site Resources Integrate on-site wastewater treatment system with landscape design Irrigation Systems Recycle graywater for landscape irrigation Siting Analysis Investigate microclimate (specific variations from regional climatic conditions) 材料选择: Heavy timbers were salvaged from the Amouries building across the street, slated for demolition. (60% of primary wood structure is reused heavy timbers.) Red brick cladding from the streets of Vancouver was used. (100% of exterior cladding is reused brick.) Over 50% of materials are reused or recycled, including reinforcing steel, structural steel, plywood, framework timbers, and doors and frames. Recycled aggregate was used in the concrete. Engineered wood products and polished concrete floors were used. Diversion of Construction & Demolition Waste A comprehensive waste management plan was implemented during construction. Waste separation diverted more than half of the waste from the landfill. 室内环境品质: The occupants enjoy natural daylighting and 100% fresh air at all times. (Operable windows and high intake louvers provide for continuous fresh air without recirculating office air back into the building.) The natural ventilation system in the building was designed to provide 20 cfm ( Air quality within the building is enhanced through the careful material choices: carpet is laid without adhesives, millwork is constructed from formaldehyde-free boards, and finishes are solvent-free/low-emission products. Construction sequencing was specified to ensure flushing of the building during drywall installation and finishing, painting and caulking, and carpet installation. Copy machine areas are directly vented to improve indoor air quality. Building users have operable windows and control over heat in workspaces. Education of the user is a must for optimal comfort within the structure. The limited ductwork systems and the absence of filters reduce areas where dust and dirt can collect.
|
|
住房和城乡建设部科技与发展促进中心(CSTCMOC) 中国绿色建筑委员会(CHINAGBC) 国际智能、绿色建筑与建筑节能大会(IGEBC) 指定合作网站
承办:沃德高科(北京)科技有限公司
Copyright ©2007-2008 CHINAGB.NET.All Rights Reserved. 京ICP备07024683号
通信地址:住房和城乡建设部北附楼312室(100835)
联系信箱:nengyuanshijie
163.com 传真电话:010-88585380
合作热线:010-88585610/11/12转814/813/810/ 合作部:QQ:122236888 编辑部:769172617
关于我们 - 联系我们 - 广告服务 - 友情链接 - 网站导航