能源世界-Energy Resource Center

地址: Downey, CA

建筑面积: 4,140 sq. meters

竣工日期: 1995

高度: 2-story building 

能源利用: Energy efficiency at the Energy Resource Center is achieved through careful integration of lighting, heating, cooling, insulation, and energy management control systems. Design techniques and building technologies work together to minimize heating and cooling requirements, maximize the use of natural daylight, and maintain high indoor air quality.

Computer modules indicate that the ERC exceeded California Energy Commission Title 24 standards for new buildings by 40%.

Non-CFC, rigid-foam insulation was added to the walls, reducing heat transfer by 50%. Roof insulation in the remodeled east and west sections provides an R-value of 38, double the R-value of traditional California roofs. Insulation on the new center roof section has an R-value of 30.

Careful sealing of doors and seams minimizes energy loss through air infiltration.

A highly reflective roof coating reduces heat absorption between 10% and 40%, dramatically decreasing air-conditioning requirements. Its reflective roof also decreases the ERC's contribution to the urban heat island effect.

Low-e glass windows further reduce heating and cooling needs by allowing little heat to penetrate during warm months or escape during winter.

Skylights and translucent window walls allow natural daylight to illuminate interior spaces. (These daylighting techniques, combined with energy-efficient lighting systems, reduce electric lighting requirements by 40%, to slightly less than one watt per ft2.)

Installation of T-8 compact fluorescent lamps and electronic ballasts, dimmer switches, and occupancy and light sensors reduces energy demand. High-efficiency lighting also reduces internal heat load, requiring less energy for air conditioning.

Both gas and electric heating and cooling systems were installed in the ERC, thereby minimizing energy requirements. (The four systems include: indirect/direct evaporative cooling, desiccant units, absorption chillers/heaters, and package units.)

An automated energy management system monitors all major building conditions—temperature, airflow, lighting, energy use, etc.—and adjusts them for energy efficiency. 节水方案: The design team chose plumbing fixtures and landscaping practices that reduce water, energy, and sewage treatment requirements. Ultra-low-flow toilets, which reduce water usage by at least 50% compared to conventional toilets, were used; the Los Angeles Department of Water and Power provides rebates for the installation of ultra-low-flow toilets. Drip irrigation was specified and installed for water-conserving landscaping.

材料选择: The ERC design team sought to minimize the use of natural resources by decreasing consumption, reusing materials, recycling, incorporating products that contain post-consumer recycled content, and avoiding materials that threaten fragile ecosystems.

About 80% of all ERC construction materials, interior furnishings, and displays are recycled, contain recycled materials, or are made of renewable resources.

Recycled-content building materials were incorporated throughout the ERC, including recycled steel, glass tiles, and plastic bathroom partitions.

Materials were specified to protect fragile ecosystems when possible; virgin products were avoided. For example, the ERC entry lobby is laid with reprocessed wood from an old Banana Republic warehouse.

Of note is the first carpet "lease back" program; instead of purchasing carpet, the ERC leases the services it provides. Another interesting building material at the ERC is rebar made from confiscated weapons acquired through the LA Sheriff's Department.

Diversion of Construction & Demolition Waste

The existing Gas Company building was reused; instead of demolishing the 1957 office complex, the structure was dismantled as needed. (Approximately 60% of the old building materials were either left in place, removed for future reinstallation, or recycled.

Steps were taken to reduce the amount of waste destined for local landfills by recycling hundreds of tons of demolition material. Items separated for recycling included: concrete (232 tons sent to crushers and recyclers), asphalt (820 tons), metal (57 tons), drywall (27 tons), and roofing materials (23 tons).

室内环境品质: The Energy Resource Center's designs, systems, and material choices optimize the quality of the indoor environment. Efforts were made to minimize the installation of products containing toxic substances and to maximize the use of fresh air in energy-efficient ventilation systems.

Designers avoided, where feasible, selecting materials that offgas harmful chemicals. Sensors to monitor carbon dioxide levels and control air intake were specified to optimize indoor air quality as well as energy efficiency in the main exhibit hall. Periodic inspection and maintenance of the ERC's air-conditioning systems were specified to insure optimal indoor air quality.

Indoor Air Quality (IAQ) consultants reviewed and evaluated the building design, including construction materials and mechanical systems; developed a plan outlining IAQ commissioning guidelines to allow the establishment of baselines for indoor environment shortly after the building was occupied; and established an IAQ monitoring program to evaluate the building construction practices.

Air quality in the ERC meets ASHRAE Standard 62. Carbon dioxide levels will be monitored and kept below 700 ppm. Airborne particulate levels in the supply-air to the building will be controlled by the use of 12"-deep box filters and 2"-deep pleated panel filters in the main Air Handling Units, with respective efficiencies of 65% and 35% as determined by ASHRAE Atmospheric Dust Spot Test. Desiccant cooling systems are installed in the kitchen areas, where higher than normal latent heat loads are expected. Prior to occupancy, ventilation procedures were carried out to minimize the build-up of construction pollutants.

新闻订阅】 【打印】 【网站论坛】 【字体: 】 【发表评论】 【关闭
现有 人对本文发表评论 [查看所有评论]
昵称:  请输入验证码:   看不清图片,请点击图片!
申请加精
相关文章

最新资讯
·可再生能源:如何从花瓶能源到主导能源
·陕西:清洁能源发展潜力大
·国际节能减排面面观
·新颁布条例如何推进民用建筑节能的开展?
·既有民用建筑节能改造艰巨 居民恐负担部分费用
·别让伪劣材料毁了建筑节能大业
·国家利益与能源战略
·从奥运看绿色节能材料走进生活
·后能源时代已经悄然来临
·从化石能源向新能源过度 三大细分行业前景各异
 
下载排行
·《ANSYS工程结构实例分析》
·《工程勘察设计收费标准(2002年修订本)》
·《室内设计基础》
·《大学生建筑设计优秀作品集》
·《建筑设计作品博览 国外建筑竞赛优秀作品精粹
·《节能技术实用全书》(上卷)
·《光与建筑》
·《家居装修精选方案》
·《钢结构设计原理》
·《建筑力学与建筑结构》
 
行业新闻
热点专题

风能时代离我们还有多远

绿色建筑评价标识

太阳能光伏

奥运场馆践行绿色奥运
政策分析
行业人物
郑时龄
孟宪淦:破解太阳能与建筑两张皮
最新论文
最新书籍

活性炭生产工艺原理与设计

《流体力学》
最新图纸
最新资料
招标信息
论坛精华

住房和城乡建设部科技与发展促进中心(CSTCMOC) 中国绿色建筑委员会(CHINAGBC) 国际智能、绿色建筑与建筑节能大会(IGEBC) 指定合作网站
承办:沃德高科(北京)科技有限公司
Copyright ©2007-2008 CHINAGB.NET.All Rights Reserved.   京ICP备07024683号
通信地址:住房和城乡建设部北附楼312室(100835)
联系信箱:nengyuanshijie163.com  传真电话:010-88585380
合作热线:010-88585610/11/12转814/813/810/  合作部:QQ:122236888 编辑部:769172617 

关于我们 - 联系我们 - 广告服务 - 友情链接 - 网站导航